Quotaburra

Inside the quoting desk

Where did that price come from?

A customer can see the work, the price and what’s excluded. Your estimator can trace each quantity back to the job. Follow a Sydney service call through both sides of the desk.

Open the worked estimate
A site reading and a business rate join to create a quote line. Owner approval freezes the revision shared with the customer.

Worked example · Sydney

Three split systems. One service visit.

A facilities manager asks for the filters in three units to be replaced. The office checks the asset register and allows one hour and 45 minutes on site. Each filter is counted once. Labour stays in hours. The estimator adds a separately agreed fee and checks its tax treatment.

Service estimate

Example amounts in AUD
WorkQuantity and rateEx GST
Filter replacement3 × $38.50$115.50
Service technician1.75 h × $110.00$192.50
Agreed fee1 × $24.00$24.00
Subtotal $332.00GST on $308.00 $30.80Total including GST $362.80

The agreed fee carries no GST in this example. Your business chooses the treatment for each catalogue item.

The estimator’s view

What counts as a checked quantity?

A switchboard count, a wall area and a labour allowance need different evidence. Open a source to see what your estimator receives and where a job can pause.

A drawing with a written dimension

The estimator selects the sheet and revision, then marks the printed dimension and its unit. Two local readers can compare that crop. A reviewer checks the original, records what the dimension measures and attaches it to the quote. A missing unit or conflicting sheet goes back for review.

Read the drawing walkthrough →
A photo or an on-site AR measurement

For a flat surface, mark two known references and the target on the same plane. If the references disagree, the estimator asks for another view. On a supported phone, mark two tracked points at the site. The owner checks the proposed dimension against a tape or another independent reading and records the difference. A photograph alone cannot establish a ceiling’s height.

A count, an allowance or a measured area

Record where a count came from, such as the site’s equipment schedule. For a measured surface, choose two checked dimensions. A 400 mm by 600 mm face is 0.24 m². At an illustrative $42.00 per m², that line contributes $10.08 before GST. Access, preparation, waste and a minimum visit charge each need their own decision.

The customer’s view

When the job changes, keep the agreement.

Approval fixes the scope, quantities, rates, tax treatment and customer total in a numbered revision. The customer opens a private link, checks the contractor and can download that revision as a PDF. The link shows whether the customer has accepted. The owner can retrieve the original document from the job history.

Accepted service quote$362.80
Agreed fee adjustment−$12.00
Revised invoice draft$350.80

In the service example the customer approves a $12.00 reduction to the fee. GST stays at $30.80. The office can explain the invoice from two records the customer saw, the accepted quote and the approved change.

Use the units your trade sells.

Painting and landscaping

Use checked square metres for a coating or turf line. Add preparation, coats or waste explicitly so a colour change or uneven ground has a clear effect on the estimate.

Plumbing and electrical

Separate fittings counted by the item from cable or pipe sold by the metre. Record access and isolation requirements before confirming labour.

HVAC and maintenance

Count the equipment covered by the visit. Identify the site contact and access window. If a plant room is locked, the office has a specific question for the facilities manager.

Find your trade